Wastewater, Effluent, Stormwater Lagoons and Detention Ponds.

This environmentally sensitive work typically involves the following: Environmental mitigation measures, clearing and grubbing, topsoil stripping and stockpiling, erosion control, bulk native and borrow excavation, berm construction, drainage layer and geotextile installation, clay and/or HDPE liners, utility installation using directional drilling or open cut methods, storm water drainage, concrete structures, mechanical and electrical installations, fencing, topsoil restoration and seeding, and all associated roadwork and infrastructure.

The work is frequently completed using materials that must be installed at or above optimum moisture while achieving fine grading tolerances and exceeding compaction density requirements under very tight construction schedules.

We have completed projects in British Columbia and Alberta.